Ammcass Construction Engineering Group successfully completed the redevelopment of the Breathing Apparatus Chamber at Tottenham Fire Station to create realistic training scenarios for firefighters. This specialist M&E project required careful coordination, as works were carried out within an operational fire station.
Duration: 5 months
Project Type: Commercial Construction
Infrastructure & Structural Enhancements
Installation of a robust mezzanine floor structure
Creation of additional training capacity and operational flexibility
Structural works delivered to meet stringent safety standards
Enhanced authenticity to improve firefighter preparedness and performance
Internal Construction & Room Configuration
Installation of dedicated heating systems
Smoke generation and extraction plant fitted to create controlled training conditions
Mechanical & Environmental Systems
Installation of new heating systems to support multi-season training conditions
Integration of specialised smoke generation and extraction plant for controlled, safe simulation environments
Systems designed to mimic realistic fire-ground visibility and heat conditions while maintaining strict safety standards
Specialist Storage & Compliance
Purpose-built gas canister storage facility
Fully compliant storage solutions aligned with safety regulations
Infrastructure designed to safely support specialist training equipment
Building Improvements
Installation of three new windows to improve natural light and ventilation
Enhanced usability and comfort within key training areas
Upgraded internal environment to support intensive operational use

Ammcass Construction Engineering Group | All Rights Reserved | OUR PolicIES